Case Study 04

Produced Water Treatment in an Oman Heavy Oil Facility

01

Challenge

An onshore heavy oil facility in Oman was processing approximately 157,000 barrels of crude oil and 1.4 million barrels of water per day. The operator needed to maintain export crude BS&W below 0.6%, while produced-water oil content frequently exceeded the 150 ppm target.

The existing demulsifier was injected at 7–8 ppm across eight injection points.

Produced Water Treatment in an Oman Heavy Oil Facility
02

Solution

  1. Clariant Oil Services conducted bottle tests and field trials to develop a demulsifier suited to the heavy crude and produced-water separation conditions.

  2. The formulation was evaluated under actual field conditions, including winter ambient temperatures as low as 5°C. The injection rate was progressively optimized during the trial.

03

Results

Following the demulsifier optimization the facility reported:

OIL IN PRODUCED WATER

80 ppm

Lowest reported value; target was 150 ppm

OPTIMIZED DOSAGE

4 ppm

Down from 7–8 ppm

ANNUAL SAVINGS

$600,000

Approximate, reported by the facility

ADDITIONAL EXPORT OIL

27,000 bbl

Per year